Argos Phase 6.1 - Engineering, Procurement & Construction

Argos

  • Location: The Netherlands
  • Capacity: 200 000 m3
  • Project completion time: 22 months
  • Project completion date: October 2013
  • Volume: € 52 Mio
  • Scope
    • Engineering
    • Civil works
    • Tank construction
    • Coating
    • Piping structurals
    • Electrical & Instrumentation
    • Jetty
    • Pumps

Verwater constructed 9 new storage tanks as part of an expansion program of Argos. In total a 200 000 m3 expansion has been build including all piping, structural, E&I, pumps, civil works and a jetty. As a main contractor Verwater was responsible of the entire project. With several in-house disciplines Verwater took for own account the construction of the foundation and painting of the tanks.